Ok
IWCF Level 3 Drilling Well Control (Surface)
Please find the full course description further down the page.
This course is not available for online booking. Please contact us regarding possible dates.
-
Duration
5 Days
-
Language
English
-
Course code
ZOTCAD003
-
Price
Call for price
The course details are not available in German, so we redirected you to the English version.
IWCF Level 3 Drilling Well Control (Surface)
Objective
The IWCF Level 3 Drilling Well Control course is essential training for those currently working in a role that is expected to shut-in a well. The course aims to reinforce and improve the candidate’s existing knowledge and appreciation of the various stages of shutting-in a well; from kick detection to shutting in the well, to monitoring once the well is shut in and monitoring the well-kill operation.
Target Group
The Level 3 (Driller) course is designed for anyone expected to shut-in a well, such as drillers and assistant drillers. Please note: IWCF training levels 2 to 4 are designed to be sequential and first-time candidates are expected to complete Level 2 before progressing to Level 3 or Level 4. However, the training levels are also designed to be role-specific and dependent on the candidate’s work experience. For guidance and advice on which level of training you are eligible for, please get in touch.
Examination
2 written papers: Equipment and Principles & Procedures 1 practical assessment Successful completion of the course and a pass mark of 70% or above in all IWCF practical and written assessments will result in IWCF Level 3 certification which is valid for two years.
Course Contents
The 5-day course is delivered through presentation of a series of interactive lectures supported by videos and animations, group discussion, and drilling simulation exercises, supplemented by a classroom workbook and further self-study exercises. Level 3 training may be partly combined with Level 4 training for common modules and during simulator-based training with each candidate assuming their respective role as per normal drilling operations.
Contact information
Miri
Lot 960, Jalan Cattleya 3, Piasau Industroal Estate, MCLD, Miri, Sarawak, 98000, Malaysia
Closes in 46 minutes
Go to location
Cherating
Lot 2014, Mukim Sg Karang, Cherating, Kuantan, Pahang, 21600, Malaysia
Closes in 46 minutes
Go to location
Kuala Lumpur
15th Floor, Menara Atlan, 161B Jalan Ampang, Kuala Lumpur, 50450, Malaysia
Closes in 16 minutes
Go to location
Johor
Oasis Complex, Landing Craft Jetty, Johor Port, Pasir Gudang, Johor, 81700, Malaysia
Closes in 1 hour and 1 minute
Go to location